For which of the following objects can you use a standard movement type to post a goods issue directly from the valuated stock? (Choose three.)
Production order
Work center
Cost center
Profit center
Project (WBS element)
Correct answer: ACE
Question 2
In customization for costing based CO-PA we assign costs and revenues to the required value field. Match the following sources of value fields.
Cost Estimate i. Fixed Cost of Goods Manufactured.
WBS Elements ii. Freight costs.
General ledger Posting iii. Research & development costs.
Production order iv. Estimated bonuses.
Additional costs v. Production Variances.
1-v., 2-iii., 3-ii., 4-v., 5-i.
1-i., 2-iii., 3-ii., 4-v., 5-iv.
1-iv., 2-ii., 3-iii., 4-v., 5-i.
1-ii., 2-iii., 3-i., 4-v., 5-iv.
Correct answer: B
Question 3
You post goods to storage location. You notice that documents are missing, so you decide that the goods should not be used any further for the time being. The missing documents turn up at a later stage and you proceed with the respective posting. The goods are subsequently moved from storage location A to storage location B, which you also record in the system.
In what sequence are the three goods movements carried out?