Demo Questions

Question 1
An engineer responsible for server lifecycle management (e.g. Monitor, Update, Deploy) needs to build a monitoring strategy for a multi-vendor data center. The company has an established third party software as the monitoring and help desk system. 
Which option should be used to integrate Dell Server hardware into this monitoring architecture?
  1. Configure all Dell iDRACs to send alerts to the third party console. Use OME to do the rest of the lifecycle management.
  2. Configure all Dell iDRACs to send alerts to the third party console. Use iDRAC to perform update and deployment.
  3. Configure all Dell iDRACs to send alerts to OME to filter out wanted alerts and forward to the third party console. Build script to do the rest of the Dell server lifecycle management.
  4. Configure all Dell iDRACs to send alerts to OME to filter out wanted alerts and forward to the third party console. Use OME to do lifecycle management of Dell servers in the environment.
Correct answer: D
Question 2
An engineer needs to update BIOS in the following environment:
  • Over 100 servers are spread over 10 chassis 
  • All servers are in the same data center 
  • The only maintenance window is late Sunday evening when OS patches are applied and servers are rebooted 
  • Less than 10 minutes of additional downtime per server is allowed 
What is the most effective update strategy?
  1. Select On Next Reboot when applying the BIOS update via CMC before OS patches are performed.
  2. Use Dell Repository Manager to create an ISO with the update that can be booted as part of the OS patch reboot process.
  3. Configure each iDRAC to update from a network share that has a catalog and associated update package to be applied.
  4. Run the Dell Update Package (DUP) on each server with the defer reboot option before the OS patch and associated reboot is done.
Correct answer: A
Question 3
An engineer is responsible for data center bare metal deployment. The engineer deploys hundreds of servers each week and must repeatedly deploy a standard hardware (HW) configuration and put the OS on the bare metal servers. 
How should the engineer automate some of these tasks?
  1. Use OpenManage Essentials to replicate server HW using template and deploy OS
  2. Use iDRAC/LC GUI to configure server HW and deploy OS.
  3. Use DHCP enabled server configuration profiles and install OS with Lifecycle Controller.
  4. Use iDRAC/LC GUI to configure HW and PXE boot to OS installation.
Correct answer: A
EXAM SIMULATOR

How to Open TQB Files?

Use Taurus Exam Simulator to open TQB files

Taurus Exam Simulator


Taurus Exam Simulator for Windows/macOS/Linus

Download

Taurus Exam Studio
Enjoy a 20% discount on Taurus Exam Studio!

You now have the chance to acquire Exam Studio at a discounted rate of 20%.

Get Now!
-->