Question 1
What are the major disadvantages of having an improvement team that is too large?
I. Difficulty in having constructive input from the entire group.
II. Difficulty in arriving at consensus.
III. Difficulty in finding large meeting facilities.
IV. Difficulty, on the part of the recorder, in keeping up with more paperwork.
  1. I only
  2. I and II only
  3. I, II and III only
  4. I, II, III and IV
Correct answer: B
Question 2
Which of the following is NOT considered a prevention cost?
  1. Writing operating procedures.
  2. Training.
  3. Data acquisition and analysis.
  4. Calibrating test equipment.
Correct answer: D
Question 3
An improvement in quality costs is MOST clearly indicated when:
  1. Appraisal and failure costs drop.
  2. Prevention costs increase.
  3. Total quality costs fall below 15% of total sales.
  4. Management objectives are met.
Correct answer: D
EXAM SIMULATOR

How to Open TQB Files?

Use Taurus Exam Simulator to open TQB files

Taurus Exam Simulator


Taurus Exam Simulator for Windows/macOS/Linus

Download

Taurus Exam Studio
Enjoy a 20% discount on Taurus Exam Studio!

You now have the chance to acquire Exam Studio at a discounted rate of 20%.

Get Now!
-->